The local legal context
Indonesian energy projects require sector-specific analysis rather than a single general energy licence. Mining, petroleum, electricity generation, supply and renewable projects involve different authorisations and institutions. Law No. 2 of 2025 amended the mineral and coal mining framework, and later decisions or implementing measures must be checked before relying on an allocation or priority mechanism. Mining rights do not themselves authorise unrelated power or infrastructure activities.
A bankable project also needs alignment between land access, environmental approvals, construction permissions, offtake commitments and financing. Resource data, rehabilitation obligations and the allocation of regulatory change risk can materially affect value. Jurisiti can coordinate Indonesian sector counsel to map the applicable regime and review project documents. For acquisitions, verify that permits remain effective and transferable where needed; an announced policy objective or memorandum with an authority is not equivalent to an operative project approval.
Key laws & official sources
Amends the mining framework; electricity, petroleum and project-specific authorisations require separate sectoral research.
Sets environmental assessment, approval and management requirements alongside sectoral and local spatial controls.
Replaces the earlier 2021 licensing framework and links business activities, risk classification and OSS licensing.
Check the operative local text, amendments, territorial scope and procedural requirements for the facts. Translations and official summaries may lag subsequent changes.
Practical next steps
- Identify the precise energy activity and regulator
- Map land, environmental and operational approvals
- Review offtake, rehabilitation and permit transfer conditions
Documents to prepare
- Project structure and site documents
- Permits, grid terms and supply agreements
- Technical studies and financing terms

How Jurisiti can help
Connect the project’s commercial model with the regulatory permissions needed to build and operate it. Land, planning, environmental, network and sector approvals may belong to different authorities. A supply or offtake agreement should be reviewed alongside capacity, pricing mechanisms, change-in-law provisions and the allocation of operational risks.
- Project and supply agreements
- Licensing, grid access and permissions
- Renewable energy and natural-resource issues
Questions about your matter
How do I enquire about energy & natural resources in Indonesia?
Identify the jurisdiction, the people involved, any existing proceeding or deadline, and the result you need. A short chronology and the key documents help define the proposed engagement before local professional arrangements are confirmed.
Can a cross-border matter involve more than one legal system?
Yes. Indonesia may be one part of a wider matter involving another place of residence, contracting party, asset or forum. Applicable law, jurisdiction and enforcement should be assessed separately, using the relevant national and international rules.
Does this guide establish a lawyer-client relationship?
No. An enquiry or use of this guide does not establish an engagement. Conflicts, professional authority, scope, responsibilities and fees must be confirmed before work is undertaken.
These guides provide general legal information. The operative law, deadlines, professional permissions and scope of work are confirmed for the particular matter. Where lawful and available, representation may be arranged through appropriately authorised local practitioners, subject to confirmation of professional authority, practical access and an agreed engagement.